close
Download our Mobile App for free With the instant messaging feature, Messaging is now live, start using it now!
Todo Menu

Solicitações De Construção E Edificação / Produtos De Infra-Estrutura

Você está visualizando anúncios da subcategoria Produtos de infra-estrutura na categoria Construção e Edificação.

•Construction of new primary and secondary drainage and rainwater treatment plants in cities. Improvement of existing infrastructures. Reduction of flood risk in cities. Improvement of urban environment, hygiene and cleanliness conditions. Reduction of pollution levels in cities. Increase urban mobility. Strengthening of municipalities’ infrastructure management capacities. Scope of Work: •Construction of rainwater drainage channels. Regulation of related roads. Partnership Requirements: 1. International experience in the field. 2. Provision of the necessary materials for the implementation of such studies. 3. Submission of a reference list of implemented projects. 4. Having solid financial resources for the implementation of such studies.

May you please provide the prices for the attached items attached. If possible by end of day today. Please see the attached requests for mechanical and electrical works.

looking for a compagny who cells all industrial components for mounting large capacity reverse osmosis installations. pump manual and motorized valve pressure switch conductivity meter and any complementary component pressure vessels and reverse osmosis membrane also rotary flow meters are also needed

Requested sewage treatment plant for a compound consisting of 240 apartment in Libya , would you please send to us your propusal for complete plant including all required equipment

We are interested in the Construction of a new Septic Tank reception and Treatment Facility at Al Ghabawi.

We are interested in the Consulting Services for the preparation of a Feasibility Study Sustainable wastewater disposal: Environmental protection and improved sanitation, the closing date to submit offers 16 Feb 2021.

For our Hotel project in Suriname we need some mechanical equipment for our water inlet / outlet infrastructure.

Construction of the first phase of a new WWTP which its final capacity will be 54,000 m3/ day; this first phase (with a capacity of 36,000 m3 /day) will be contracted on a design and build mode.

  • 1
  • 2
  • Next Page
Apoio, suporte Whatsapp Voltar Ao Topo