close
Download our Mobile App for free With the instant messaging feature, Messaging is now live, start using it now!
Menu Complet

The scope of work covers all the detailed engineering for the entire project, procurement and construction, commissioning and start-up of the gas pipeline system extending from the designated tie-in with the 36" existing Jordan Gas Transmission Pipeline to the fiscal metering at the end user site. The project mainly consists of engineering, procurement and construction of metering station, pipelines, valves, electrical system, communication system, control system, utilities system, building system and other matching facilities for the pipeline system. The Applicants will be evaluated in the following three major areas: Project and Technical Capability Health, Safety and Environment (HSE) and Quality Systems Company Information.

Iwant cvt bilt honda civic 2107 1600cc Or spare parts for transmission

We want a Turkish company as a partner to work in a coalition in projects inside Jordan. Contracting and supplying stations, transformers, transmission lines and electrical circuit breakers

i need a list of emails all the suppliers for lattice towers in turkish market

Iam searching for a gearbox For renault fluence 2013 Cvt gear box

I want a full 2017 Ford Fusion hybrid gear, how much is the price and shipping method

Need Electric Overhead transmission lines supplier and contractor to install complete system in Iraq

  • 1
  • 2
  • Next Page
L'assistance Whatsapp Retour Au Haut De Page