close
Download our Mobile App for free With the instant messaging feature, Messaging is now live, start using it now!
Todo Menú

Plant of a Bamboo Pulp-BKP bamboo software plant that can be operated by Turkey Process, including civil works and utility equipment that can produce thirty tons a day The following information must be included: (1) Production Process, which will install thirty tons of bamboo Pulp-BKP a day (2) Chemical Method (Treatment Method) to be used (3) Necessary Chemicals to be used (4) Steam Boiler and other Utility Equipment (5) Building need (6) Insurance formechnictools

We are looking for boiler working with 40 ton of water + 16 bar presure

we are looking for 62 tons per day flake ice and tube ice production machine for Sohar, Oman. Can you supply, including installation and commissioned. Pls send offer with factory lay out features required

1 cold room 1 kitchen equipment 2 fruit and vegetable dryers 2 meat and fish smokers 1 sous vide has 2 bell 1 square PM stainless steel work table 1 electric sterilizer 1 stainless steel tank

Interested in a boiler for melting fat from bone with a fat separator. We apply TS.

I am very interested in your product (Fruit And Vegetable Quick Freezing Machine/ IQF Machine).

fish processing and canning plant 5o ton daily - we need a 50ton plant with 1000t cold storage facilities in mombasa kenya . complete plant design assemble and commission .

  • 1
  • 2
  • 3
  • Next Page
Apoyo Whatsapp Volver Arriba